3rd Airport / Terminal Building 6,500 Tons Manufacturing + Assembly

The 3rd Airport Terminal Building Project is another important example of Sin-ay Engineering’s expertise in large-scale construction. The project involved 6,500 tons of steel and focused on creating a durable, functional terminal designed to accommodate high passenger capacity while meeting international standards. The building’s design, both internally and externally, adhered to modern architectural standards, and its supporting systems were built to withstand high static and dynamic loads. Sin-ay Engineering played a pivotal role in the steel manufacturing and assembly, contributing significantly to the airport’s international capacity and Turkey’s infrastructure leadership.