Oyak Synthetic Carbon Warehouse Building – 1,111 Tons / 2023-2024

The Oyak Synthetic Carbon Warehouse Building Project is a significant demonstration of Sin-ay Engineering’s expertise in industrial structures. The project involves constructing a modern warehouse for storing and managing synthetic carbon materials used in production.

Project Details:

  • Capacity and Materials: 1,111 tons of steel were used in the warehouse construction.
  • Design and Manufacturing: The steel structure was meticulously planned to enhance functionality and ensure long-term durability.
  • Construction Years: Started in 2023 and is expected to be completed in 2024.

Industrial Impact:

The project enhances production efficiency by addressing logistics needs and improving industrial storage standards, contributing to the regional industrial infrastructure.

Sin-ay Engineering’s involvement showcases its capability in industrial design and assembly.